Preparation for removing the sleepers
.

Wooden posts were put in to guide the concrete
.

The concrete was then levelled out
.

The goods train goes over the crossing
.

The road starts to take shape
.

The concrete edging was then put in place
.

Another angle of the tarmaced road
.

Wooden bollards were installed either side of the road |

The check rails were then put in place
.

The concrete was then poured into the track bed
.

First test train through the set concrete
.

Preparing the area for the new road
.

Work starts on the other side of the crossing
.

The road was then tarmaced
.

The tarmac is finished and ready for painting
|